tree icon

Road Work on McLean Road

Road Work AheadThe section of McLean Road between US 21 and Sandfield Road is scheduled for maintenance.

SC DOT currently plans to do some brush management and limb trimming along this route.
Approximately 500’ of pavement needs an asphalt overlay for strengthening and they have identified
one area in need of full depth patching; as well as pothole patching in some locations.
Depending on the weather, DOT anticipates this being done by December 8th.
Please be patient and watch for men at work.